Minimum maintenance standards for highways in the city of toronto, O. Reg. 612/06

Section 6

Potholes

Cite as Minimum maintenance standards for highways in the city of toronto, O. Reg. 612/06, s. 6 · current to November 11, 2026 · consolidated from May 3, 2018 · read from e-Laws on November 16, 2026

The text

(1) If a pothole exceeds both the surface area and depth set out in Table 1, 2 or 3 to this section, as the case may be, the standard is to repair the pothole within the time set out in Table 1, 2 or 3, as appropriate, after becoming aware of the fact. O. Reg. 612/06, s. 6 (1); O. Reg. 367/18, s. 8 (1). (1.1) For the purposes of this section, the surface area and depth of a pothole may be determined in accordance with subsections (1.2) and (1.3), as applicable, by an employee, agent or contractor of the City whose duties or responsibilities include one or more of the following: 1. Patrolling highways. 2. Performing highway maintenance activities. 3. Supervising staff who perform activities described in paragraph 1 or 2. O. Reg. 367/18, s. 8 (2). (1.2) The depth and surface area of a pothole may be determined by, (a) performing an actual measurement; or (b) performing a visual estimate. O. Reg. 367/18, s. 8 (2). (1.3) For the purposes of this section, the surface area of a pothole does not include any area that is merely depressed and not yet broken fully through the surface of the roadway. O. Reg. 367/18, s. 8 (2). (2) A pothole is deemed to be in a state of repair if its surface area or depth is less than or equal to that set out in Table 1, 2 or 3, as appropriate. O. Reg. 612/06, s. 6 (2); O. Reg. 46/13, s. 6. TABLE 1 POTHOLES ON PAVED SURFACE OF ROADWAY Class of Highway | Surface Area | Depth | Time 1 | 600 cm² | 8 cm | 4 days 2 | 800 cm² | 8 cm | 4 days 3 | 1000 cm² | 8 cm | 7 days 4 | 1000 cm² | 8 cm | 14 days 5 | 1000 cm² | 8 cm | 30 days TABLE 2 POTHOLES ON NON-PAVED SURFACE OF ROADWAY Class of Highway | Surface Area | Depth | Time 3 | 1500 cm² | 8 cm | 7 days 4 | 1500 cm² | 10 cm | 14 days 5 | 1500 cm² | 12 cm | 30 days TABLE 3 POTHOLES ON PAVED OR NON-PAVED SURFACE OF SHOULDER Class of Highway | Surface Area | Depth | Time 1 | 1500 cm² | 8 cm | 7 days 2 | 1500 cm² | 8 cm | 7 days 3 | 1500 cm² | 8 cm | 14 days 4 | 1500 cm² | 10 cm | 30 days 5 | 1500 cm² | 12 cm | 60 days
Read the Minimum maintenance standards for highways in the city of toronto on e-Laws ↗

Made under City of Toronto Act, 2006, S.O. 2006, c. 11, Sched. A.