Generation Facilities, O. Reg. 574/06
Schedule 10
Cite as Generation Facilities, O. Reg. 574/06, Schedule 10 · current to November 11, 2026 · consolidated from December 21, 2006 · read from e-Laws on November 16, 2026
The text
Schedule 10 prescribed buildings and structures — darlington Generation Station (Assessment Roll Number 1817-010-020-09700)
Item | Building/Structure
1. | Unit 0 service area (common services area between units 1-2 and 3-4)
2. | Powerhouse (turbine hall & extension, reactor service — all units)
3. | Reactor building unit one
4. | Reactor building unit two
5. | Reactor building unit three
6. | Reactor building unit four
7. | West fuel annex — fuel loading facility (attached to powerhouse)
8. | East fuel annex — fuel loading facility (attached to powerhouse)
9. | Cooling water pump house one
10. | Cooling water pump house two
11. | Cooling water pump house three
12. | Cooling water pump house four
13. | Water treatment plant (sediment removal)
14. | Emergency power system electrical building
15. | Emergency water supply pump house (back-up water supply)
16. | Circulating water discharge structure (cooling water control)
17. | Emergency power generator #1
18. | Emergency power generator #2
19. | Emergency power generator fuel management building
20. | Fuel oil pump house #1
21. | Fuel oil pump house #2
22. | Reactor maintenance trailer (components building)
23. | Standby generator one (back-up power supply)
24. | Standby generator two (back-up power supply)
25. | Standby generator three (back-up power supply)
26. | Standby generator four (back-up power supply)
27. | Vacuum building
28. | Pressure relief duct
29. | Steam heating boiler house (back-up heat and steam)
30. | Switching station (transforming equipment)
Read the Generation Facilities on e-Laws ↗
Made under Assessment Act, R.S.O. 1990, c. A.31.