Generation Facilities, O. Reg. 574/06
Section 5
Prescribed buildings and structures
Cite as Generation Facilities, O. Reg. 574/06, s. 5 · current to November 11, 2026 · consolidated from December 21, 2006 · read from e-Laws on November 16, 2026
The text
(1) The following buildings and structures are prescribed for the purposes of subsection 19.0.1 (1) of the Act, effective April 1, 1999:
1. The buildings and structures at the Bruce Generation Station that are listed in Schedules 7 to 9, for assessment roll number 41-08-260-004-23401, assessment roll number 41-08-260-004-23403 and assessment roll number 41-08-260-004-23404, respectively.
2. The buildings and structures at the Darlington Generation Station that are listed in Schedule 10 for assessment roll number 1817-010-020-09700.
3. The buildings and structures at the Pickering Generation Station that are listed in Schedule 11 for assessment roll number 1801-020-022-06800.
4. The water intake and discharge facilities at the Bruce, Darlington and Pickering Generation Stations. O. Reg. 574/06, s. 5 (1).
(2) Despite subsection (1), no building or structure whose construction was completed after December 31, 2002 is prescribed for the purposes of subsection 19.0.1 (1) of the Act. O. Reg. 574/06, s. 5 (2).
Read the Generation Facilities on e-Laws ↗
Made under Assessment Act, R.S.O. 1990, c. A.31.