Generation Facilities, O. Reg. 574/06

Section 1

Definitions

Cite as Generation Facilities, O. Reg. 574/06, s. 1 · current to November 11, 2026 · consolidated from December 21, 2006 · read from e-Laws on November 16, 2026

The text

In this Regulation, “Bruce Generation Station” means the generation facility located in the Municipality of Kincardine having, on the 1999 assessment roll as amended, (a) assessment roll numbers beginning 41-08-260-004-23401 and the legal description “CON A PT LOTS 19 TO 28, RP 3R7014 PARTS 1 TO 21, RP 3R7022 PARTS 1 TO 23”, (b) assessment roll numbers beginning 41-08-260-004-23403 and the legal description “CON A PT LOTS 11 TO 17 PART TP OF INVERHURON, RP 3R7016 PARTS 1 TO 5, RP 3R7021 PARTS 1 TO 15”, (c) assessment roll numbers beginning 41-08-260-004-23404 and the legal description “CON A PT LOTS 11 TO 24, RP 3R7017 PARTS 1 TO 43”, (d) assessment roll numbers beginning 41-08-260-004-23405 and the legal description “CON A PT LOTS 18 TO 23, RP 3R7018 PARTS 1 TO 6”, (e) assessment roll numbers beginning 41-08-260-004-23411 and the legal description “CON A PT LOTS 11 TO 21, RP 3R7015 PARTS 2 TO 6 RP 3R7026 PART 1”, (f) assessment roll numbers beginning 41-08-260-004-23421 and the legal description “CON A PT LOT 21, RP 3R7015 PART 1”, and (g) assessment roll numbers beginning 41-08-260-001-17320 and the legal description “CONCESSION 4 PT LOTS A, B, C, D AND E, RP 3R7019 PARTS 1 TO 3”; “Darlington Generation Station” means the generation facility located in the Municipality of Clarington, having assessment roll numbers beginning 18-17-010-020-09700 and the legal description “CON BF PT LOT 18 TO 24, RP 10R342, RP 10343, RP 10R398 EXP PLAN 74387, RP 10R94, RD ALLOWANCE PT, RP 10R664 PART 1 AND RP 10R1551 PART 1”, as set out on the 1999 assessment roll; “generation facility” has the meaning assigned in subsection 2 (1) of the Electricity Act, 1998; “Industrial Product Price Index” means the Industrial Product Price Index contained in Statistics Canada Catalogue Number 62-011-XPE, Statistical Tables, Table 1: Summary of Recent Price Movements, All Commodities Index; “Pickering Generation Station” means the generation facility located in the City of Pickering, having assessment roll numbers beginning 18-01-020-022-06800 and the legal description “CON BF RANGE 2, 3 PT LOT 17-22 & PT RD ALLOW BETWEEN BF RANGE 2, 3 & PT PT RD ALLOW BETWEEN LOT 18, 19, 20, 21”, as set out on the 1999 assessment roll; “replacement cost new” means, in respect of a building or structure, the cost of reconstructing the building or structure, as determined by the Municipal Property Assessment Corporation for the assessment year in question, prior to any reduction in value associated with accumulated depreciation and obsolescence; “water intake and discharge facilities” includes tunnels, pipes, ducts, forebays, channels, groins, retaining or revetment walls, berms, and associated structures and improvements that are related to the intake and discharge of water at the Bruce Generation Station, the Darlington Generation Station or the Pickering Generation Station. O. Reg. 574/06, s. 1.
Read the Generation Facilities on e-Laws ↗

Made under Assessment Act, R.S.O. 1990, c. A.31.