Zoning by-laws, holding by-laws and interim control by-laws, O. Reg. 545/06

Schedule 1

Cite as Zoning by-laws, holding by-laws and interim control by-laws, O. Reg. 545/06, Schedule 1 · current to November 11, 2026 · consolidated from June 30, 2026 · read from e-Laws on November 16, 2026

The text

Schedule 1 INFORMATION AND MATERIAL TO BE PROVIDED IN AN APPLICATION UNDER SUBSECTION 34 (10.1) OF THE ACT 1. The name, address, telephone number and, if applicable, the e-mail address of the applicant. 2. The date of the application to the municipality or planning board. 3. If known, the names and addresses of the holders of any mortgages, charges or other encumbrances in respect of the subject land. 4. The current designation of the subject land in the applicable official plans, and an explanation of how the application conforms with the official plans. 5. The current zoning of the subject land. 6. The nature and extent of the rezoning requested. 7. The reason why the rezoning is requested. 8. If the subject land is within an area where the municipality has pre-determined the minimum and maximum density requirements or the minimum and maximum height requirements, a statement of these requirements. 9. A description of the subject land, including such information as the municipality, concession and lot numbers, registered plan and lot numbers, reference plan and part numbers and street names and numbers. 10. The frontage, depth and area of the subject land, in metric units. 11. If the application is to implement an alteration to the boundary of an area of settlement or to implement a new area of settlement, details of the official plan or official plan amendment that deals with the matter. 12. If the application is to remove land from an area of employment, details of the official plan or official plan amendment that deals with the matter. 13. If the subject land is within an area where zoning with conditions may apply, an explanation of how the application conforms to the official plan policies relating to zoning with conditions. 14. Whether access to the subject land will be, (a) by a provincial highway, a municipal road that is maintained all year or seasonally, another public road or a right of way; or (b) by water. 15. If access to the subject land will be by water only, the parking and docking facilities used or to be used and the approximate distance of these facilities from the subject land and the nearest public road. 16. The existing uses of the subject land. 17. Whether there are any buildings or structures on the subject land. 18. If the answer to section 17 is yes, the following information for each building or structure: (a) the type of building or structure; and (b) in metric units, the setback from the front lot line, rear lot line and side lot lines, the height of the building or structure and its dimensions or floor area. 19. The proposed uses of the subject land. 20. Whether any buildings or structures are proposed to be built on the subject land. 21. If the answer to section 20 is yes, the following information for each building or structure: (a) the type of building or structure; and (b) in metric units, the setback from the front lot line, rear lot line and side lot lines, the height of the building or structure and its dimensions or floor area. 22. If known, (a) the date the subject land was acquired by the current owner; (b) the date any existing buildings or structures on the subject land were constructed; and (c) the length of time that the existing uses of the subject land have continued. 23. Whether water will be provided to the subject land by a publicly owned and operated piped water system, a privately owned and operated individual or communal well, a lake or other water body or other means. 24. Whether sewage disposal will be provided to the subject land by a publicly owned and operated sanitary sewage system, a privately owned and operated individual or communal septic system, a privy or other means. 25. If the application would permit development on privately owned and operated individual or communal septic systems, and more than 4500 litres of effluent would be produced per day as a result of the development being completed, (a) a servicing options report; and (b) a hydrogeological report. 26. Whether storm drainage will be provided by sewers, ditches, swales or other means. 27. If known, (a) whether the subject land has ever been the subject of an application under the Act for approval of a plan of subdivision or for a consent; (b) if the answer to clause (a) is yes, the file number and status of the application; (c) whether the subject land has ever been the subject of an application under section 34 of the Act; and (d) whether the subject land has ever been the subject of a Minister’s Zoning Order and, if known, the Ontario Regulation number of that order. 28. A sketch showing, in metric units, (a) the boundaries and dimensions of the subject land; (b) the location, size and type of all existing and proposed buildings and structures on the subject land, indicating their distance from the front lot line, rear lot line and side lot lines; (c) the approximate location of all natural and artificial features (for example, buildings, railways, roads, watercourses, drainage ditches, banks of rivers or streams, wetlands, wooded areas, wells and septic tanks) that, (i) are located on the subject land and on land that is adjacent to it, and (ii) in the applicant’s opinion, may affect the application; (d) the current uses of land that is adjacent to the subject land; (e) the location, width and name of any roads within or abutting the subject land, indicating whether it is an unopened road allowance, a public travelled road, a private road or a right of way; (f) if access to the subject land will be by water only, the location of the parking and docking facilities to be used; and (g) the location and nature of any easement affecting the subject land. 29. An explanation of how the application for an amendment to the zoning by-law is consistent with policy statements issued under subsection 3 (1) of the Act. 30. Whether the subject land is within an area of land designated under any provincial plan or plans. 31. If the answer to section 30 is yes, an explanation of how the application conforms or does not conflict with the provincial plan or plans. 31.1 A proposed strategy for consulting with the public with respect to the application. 32. An affidavit or sworn declaration by the applicant that the information required under this Schedule and provided by the applicant is accurate.
Read the Zoning by-laws, holding by-laws and interim control by-laws on e-Laws ↗

Made under Planning Act, R.S.O. 1990, c. P.13.