Adjustments under Section 25.33 of the Act, O. Reg. 429/04
Section 10.12
Eligible generation facilities
Cite as Adjustments under Section 25.33 of the Act, O. Reg. 429/04, s. 10.12 · current to November 11, 2026 · consolidated from July 1, 2025 · read from e-Laws on November 16, 2026
The text
(1) A generation facility of an eligible generator is an eligible generation facility in relation to an eligible purchase agreement for a base period if the requirements described in subsection (2), if applicable, have been satisfied before the beginning of the base period and if the conditions described in subsection (3) are satisfied throughout the base period. O. Reg. 101/25, s. 4.
(2) If the generation facility has not been in commercial operation before the binding date of the eligible purchase agreement and the facility is or will be located within one or more local municipalities, the eligible generator must have satisfied the following requirements before the base period for the generation facility to be an eligible generation facility:
1. The eligible generator must have obtained a separate written resolution from the municipal council of each of the local municipalities in which the generation facility is located or will be located that the municipal council supports having the generation facility operate on lands in the local municipality, subject to the eligible generator complying with, and the eligible generation facility being in compliance with, all applicable provincial and municipal laws and regulations.
2. The written resolution must be in the form specified by the IESO and must be signed or confirmed, in writing, by the chief administrative officer of the local municipality or, if there is no chief administrative officer, by a person in an equivalent position.
3. A copy of the written resolution must be provided to the eligible purchase customer under the eligible purchase agreement and to the IESO.
4. Such other documents or information related to the resolution or to each local municipality’s support as may be required by the IESO must be provided to the IESO in the form specified by the IESO and within the time specified by the IESO. O. Reg. 101/25, s. 4.
(3) The following conditions must be satisfied throughout the base period for the generation facility to be an eligible generation facility:
1. The generation facility must be specified in the eligible purchase agreement as a facility that will be supplying eligible electricity purchased under the agreement into the IESO-controlled grid or the distribution system of a licensed distributor.
2. The generation facility must generate the electricity that is purchased under an eligible purchase agreement only from wind, water, biomass, biogas, biofuel, solar energy or geothermal energy.
3. The generation facility must not consume more electricity than it generates.
4. Except in the circumstances described in subclause 10.13 (1) (d) (i), during each hour of the applicable base period some volume of eligible electricity must be physically supplied from the eligible generation facility into the IESO-controlled grid or the distribution system of one or more licensed distributors.
5. If the generation facility was not in commercial operation before the binding date of the eligible purchase agreement, the generation facility must not be located, in whole or in part, on lands designated in an official plan of a municipality or planning board as a prime agricultural area, as defined in the Provincial Planning Statement, 2024 issued under section 3 of the Planning Act. O. Reg. 101/25, s. 4.
(4) Within 15 days after the end of a base period in which a generator was an eligible generator, the eligible generator shall provide the IESO with an attestation, in the form specified or approved by the IESO, that the condition set out in paragraph 4 of subsection (3) was satisfied by each of the eligible generator’s eligible generation facilities throughout the base period. O. Reg. 101/25, s. 4.
(5) If a generator does not, within 15 days after the end of a base period in which it was an eligible generator, satisfy the requirement in subsection (4) in respect of an eligible generation facility of the eligible generator, no volume of electricity physically supplied from that eligible generation facility during that base period will be eligible electricity. O. Reg. 101/25, s. 4.
Read the Adjustments under Section 25.33 of the Act on e-Laws ↗
Made under Electricity Act, 1998, S.O. 1998, c. 15, Sched. A.