general, O. Reg. 267/03

Section 98.0.3

Sewage biosolids from small treatment works

Cite as general, O. Reg. 267/03, s. 98.0.3 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) This section applies to sewage biosolids from municipal sewage treatment works with an approved design capacity of 45,400 cubic metres or less, but only if, (a) the sewage biosolids are not stored or treated in a lagoon; and (b) the generator ships them directly to an agricultural operation for land application. O. Reg. 338/09, s. 70. (2) The following rules apply to sampling and analysis to determine nutrient and metal content: 1. Two samples shall be taken during the two-month period before the transfer date. At least one of them shall be taken during the one-month period before the transfer date. 2. The samples shall be analyzed for the parameters listed in subparagraphs 2 i to vi of subsection 98 (2). 3. The concentration of each parameter shall be calculated as the average of the results from all samples taken during the four-month period before the transfer date. The results from the samples mentioned in paragraph 1 may be excluded from the calculation if, on the transfer date, the generator has not yet received those results. O. Reg. 338/09, s. 70. (3) The following rules apply to sampling and analysis to determine pathogen levels: 1. Two samples shall be taken during the two-month period before the transfer date. At least one of them shall be taken during the one-month period before the transfer date. 2. If the generator wishes to confirm that the NASM is CP2, the samples need to be analyzed only for E. coli. 3. If the generator wishes to confirm that the NASM is CP1, the samples shall be analyzed for the pathogens listed in Column 1 of Table 2 of Schedule 6. 4. The level of each pathogen shall be calculated as the geometric mean of the results from all samples taken during the four-month period before the transfer date. The results from the samples mentioned in paragraph 1 may be excluded from the calculation if, on the transfer date, the generator has not yet received those results. O. Reg. 338/09, s. 70.
Read the general on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.