general, O. Reg. 267/03
Section 87
Design and construction
Cite as general, O. Reg. 267/03, s. 87 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall construct or expand a liquid nutrient transfer system in the course of the operation, other than a floor transfer system defined in section 88, unless,
(a) the system is designed and constructed or expanded in accordance with this Part;
(b) a professional engineer designs the construction or expansion; and
(c) a professional engineer performs a general review of the construction or expansion to ensure that it complies with this Part. O. Reg. 338/09, s. 66 (1).
(1.1) Subsection (1) also applies, with necessary modifications, to a person who, on and after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, constructs or expands a liquid nutrient transfer system on the NASM plan area for the purpose of transferring liquid NASM in the course of the operation. O. Reg. 338/09, s. 66 (2).
(2) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall install pipe connections in a liquid nutrient transfer system used in the course of the operation unless they are installed using specifically designed gasketed fittings, such as tees, saddles, end caps and elbows, that are compatible with the pipe material. O. Reg. 267/03, s. 87 (2).
(2.1) Subsection (2) also applies, with necessary modifications, to a person who, on and after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, installs pipe connections in a liquid nutrient transfer system on the NASM plan area for the purpose of transferring liquid NASM in the course of the operation. O. Reg. 338/09, s. 66 (3).
(3) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall install a liquid nutrient transfer system used in the course of the operation with the pipe entering the permanent liquid nutrient storage facility unless a flexible watertight gasket or membrane has been installed between the pipe and the floor or wall of the storage tank to serve as an anti-seepage collar. O. Reg. 267/03, s. 87 (3); O. Reg. 848/21, s. 7.
(4) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall install a liquid nutrient transfer system used in the course of the operation where the elevation of the facility is higher than the elevation of the transfer system and where there is an opportunity for backflow to the pump or pump-out chamber unless the transfer system has a primary shut-off valve and secondary shut-off valve. O. Reg. 267/03, s. 87 (4); O. Reg. 447/03, s. 40 (2).
(5) Subsections (3) and (4) also apply, with necessary modifications, to a person who, on and after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, installs a liquid nutrient transfer system on the NASM plan area for the purpose of transferring liquid NASM in the course of the operation. O. Reg. 338/09, s. 66 (4).
Read the general on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.