general, O. Reg. 267/03
Section 74
Synthetic liners
Cite as general, O. Reg. 267/03, s. 74 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) If, on or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, a synthetic liner is installed in a permanent nutrient storage facility used on a farm unit in the course of the operation, the liner must be anchored or bonded to the facility, subgrade, or berms made of earth according to good engineering practices or to the manufacturer’s specification. O. Reg. 267/03, s. 74 (1); O. Reg. 511/05, s. 40.
(2) If an accessory structure creates a discontinuity in the synthetic liner, the liner must be bonded to the structure in accordance with the manufacturer’s recommendation or using a method satisfactory to the professional engineer. O. Reg. 267/03, s. 74 (2).
(3) The qualified professional or other person responsible for supervising the construction of the facility shall,
(a) inspect the synthetic liner before the filling of the construction or the covering of the liner to ensure that there are no damage or perforations within the liner; and
(b) ensure that any damage or perforations discovered during the inspection are repaired according to the engineer’s instructions. O. Reg. 267/03, s. 74 (3).
(4) The qualified professional shall inspect any repairs made to the liner to ensure that the integrity of the liner is maintained. O. Reg. 267/03, s. 74 (4).
(5) Subsections (1), (2), (3) and (4) also apply, with necessary modifications, to a person who, on or after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, installs a synthetic liner in a permanent NASM storage facility that is used on the NASM plan area in the course of the operation. O. Reg. 338/09, s. 55.
Read the general on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.