general, O. Reg. 267/03

Section 68

Sealing test holes

Cite as general, O. Reg. 267/03, s. 68 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

The qualified professional supervising the construction or expansion of a permanent nutrient storage facility shall ensure that the test holes that are excavated in the course of the site characterization and that are not required for any further purpose after the site characterization are plugged and sealed to provide a level of hydraulic conductivity that is the same or less than the hydraulic conductivity of the surrounding undisturbed soil. O. Reg. 267/03, s. 68.
Read the general on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.