Permanent solid nutrient storage facility

Cite as general, O. Reg. 267/03, s. 66 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) On or after the day on which this Regulation requires an operation to have a nutrient management strategy or nutrient management plan, no person shall construct or expand a permanent solid nutrient storage facility described in subsection (2) unless the person retains the services of a professional engineer or professional geoscientist to carry out a stage one hydrogeologic or geotechnical investigation of the site of the proposed facility that establishes, (a) the fact that there is at least 0.9 metres of soil comprised of a clay content of at least 15 per cent between the bottom of the proposed facility and bedrock or the uppermost identified aquifer; or (b) the fact that there is at least 0.5 metres of hydraulically secure soil between the bottom of the proposed facility and bedrock or the uppermost identified aquifer. O. Reg. 447/03, s. 29; O. Reg. 338/09, s. 50 (1, 2). (2) Subsection (1) applies to a permanent solid nutrient storage facility used in the course of the operation on a farm unit where the facility does not have a concrete floor and where, (a) the number of farm animals on the farm unit is sufficient to generate 300 or more nutrient units annually; or (b) the conditions set out in subsection (3) are met. O. Reg. 338/09, s. 50 (3). (3) The conditions referred to in clause (2) (b) are: 1. The person who owns or controls the farm unit, i. submits an application, on or after September 30, 2003, for a building permit under the Building Code Act, 1992 with respect to any building or structure that is used to house farm animals or to store manure and that is located or to be located on the farm unit, or ii. constructs or causes to be constructed any building or structure that is used to house farm animals or to store manure and that is located or to be located on the farm unit, if a building permit in respect of the building or structure would be required under the Building Code Act, 1992 but for the application of clause 1.3.1.1. (1) (b) of Division C of the Building Code. 2. The construction work on the building or structure would increase the capacity of the farm unit to house farm animals to a number that would be sufficient to generate 300 or more nutrient units annually. O. Reg. 338/09, s. 50 (3). (4) On or after the day on which this Regulation requires an operation to have a NASM plan for a NASM plan area, no person shall construct or expand a permanent solid NASM storage facility that is used on the NASM plan area in the course of the operation unless the facility has a concrete floor. O. Reg. 338/09, s. 50 (4).
Read the general on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.