general, O. Reg. 267/03
Section 62.1
Application of Part
Cite as general, O. Reg. 267/03, s. 62.1 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026
The text
(1) Subject to subsections (2), (3) and (4), this Part applies to an operation only if this Regulation requires the operation to have a nutrient management strategy, nutrient management plan or NASM plan. O. Reg. 338/09, s. 47.
(2) Except for sections 63 and 81, this Part does not apply to a permanent solid nutrient storage facility that has,
(a) a volume of less than 600 cubic metres;
(b) a surface area of less than 600 square metres; and
(c) walls that do not have an exposed height of more than 1 metre. O. Reg. 338/09, s. 47.
(2.1) Despite subsection (2), this Part applies to a permanent nutrient storage facility that,
(a) is located on a farm unit on which an agricultural operation treats materials through mixed anaerobic digestion in a regulated mixed anaerobic digestion facility that receives more than 10,000 cubic metres of off-farm anaerobic digestion materials in any 12-month period; and
(b) is used to store solid manure as on-farm anaerobic digestion materials received from one or more agricultural operations that are located on a farm unit other than the farm unit where the regulated mixed anaerobic digestion facility is located. O. Reg. 508/21, s. 9.
(2.2) Despite subsection (2), this Part applies to a storage facility that,
(a) is part of a regulated mixed anaerobic digestion facility that receives more than 10,000 cubic metres of off-farm anaerobic digestion materials in any 12-month period; and
(b) is used to store either or both of,
(i) off-farm anaerobic digestion materials, or
(ii) on-farm anaerobic digestion materials that are fruit, vegetables or plant materials from the production and processing of fruit or vegetables. O. Reg. 508/21, s. 9.
(3) Sections 81 to 81.4 and 82 to 86 apply with respect to the storage of NASM even if the operation is not required to have a nutrient management strategy, nutrient management plan or NASM plan. O. Reg. 338/09, s. 47.
(4) This Part does not apply to a permanent nutrient storage facility or temporary field nutrient storage site that is subject to an environmental compliance approval issued in respect of an activity mentioned in subsection 27 (1) of the Environmental Protection Act. O. Reg. 338/09, s. 47; O. Reg. 266/11, s. 8.
Read the general on e-Laws ↗
Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.