general, O. Reg. 267/03

Section 22.1

Activities requiring amendment

Cite as general, O. Reg. 267/03, s. 22.1 · current to November 11, 2026 · consolidated from April 1, 2024 · read from e-Laws on November 16, 2026

The text

(1) This section applies if a nutrient management strategy that is in force for an agricultural operation contemplates mixed anaerobic digestion in a regulated mixed anaerobic digestion facility in which at least 75 per cent, by volume, of the total amount of anaerobic digestion materials treated are on-farm anaerobic digestion materials. O. Reg. 284/13, s. 4. (1.1) This section does not apply where section 22 applies. O. Reg. 508/21, s. 7. (2) No person shall treat anaerobic digestion materials in the facility if less than 75 per cent, by volume, of the total amount are on-farm anaerobic digestion materials, unless, (a) an amendment to the strategy is prepared to reflect the decrease in the percentage of on-farm materials treated; and (b) the amendment is submitted to a Director for approval and approved by the Director. O. Reg. 284/13, s. 4. (3) Section 17 applies in respect of the amendment, with necessary modifications and with the additional modifications set out in subsections (4), (5) and (6). O. Reg. 284/13, s. 4. (4) Despite clause 17 (1) (b.1), (a) the amendment is not required to contain a contingency plan; (b) an update to the existing contingency plan, accounting for the changes to the agricultural operation that would result from the change in the percentage of on-farm materials, must be prepared before the amendment is submitted for approval; and (c) the update to the contingency plan comes into effect if and when the amendment is approved. O. Reg. 284/13, s. 4. (5) Despite subclause 17 (1) (b.2) (ii), the declaration must state, (a) that the proposed amendment is complete; (b) that it provides an accurate description of the proposed change in the percentage of on-farm materials; (c) that it provides an accurate description of the changes to be made to the facility as a result of the proposed change in the percentage of on-farm materials; and (d) that the amendment has been prepared in accordance with this Regulation, the Nutrient Management Protocol and the Sampling and Analysis Protocol. O. Reg. 284/13, s. 4. (6) Despite subsection 17 (2), the amendment must account for the maximum total quantity of prescribed materials that the person who owns or controls the operation reasonably believes will be generated and received in a single year by the operation. O. Reg. 204/19, s. 6. (7) Section 28 applies in respect of the amendment, with necessary modifications. O. Reg. 284/13, s. 4.
Read the general on e-Laws ↗

Made under Nutrient Management Act, 2002, S.O. 2002, c. 4.