Safe Drinking Water Act, 2002, S.O. 2002, c. 32

Section 119

Order for preparation of operational plans

Cite as Safe Drinking Water Act, 2002, S.O. 2002, c. 32, s. 119 · current to November 11, 2026 · consolidated from June 2, 2026 · read from e-Laws on November 17, 2026

The text

The Director may, by order served on the owner of a municipal drinking water system or a regulated non-municipal drinking water system, appoint the Agency or a person, at the owner’s expense, to prepare operational plans for the system or a part of the system or amend any plan that relates to the system if in the Director’s opinion, (a) there has been a failure to correct, within a reasonable time, deficiencies in the operational plans that are identified in an auditor’s report under Part IV or by a provincial officer in an inspection; or (b) the operational plans do not meet the minimum requirements in the Director’s directions under Part III. 2002, c. 32, s. 119.
Read the Safe Drinking Water Act, 2002 on e-Laws ↗