minimum maintenance standards for municipal highways, O. Reg. 239/02
Section 16.3
Snow accumulation on sidewalks
Cite as minimum maintenance standards for municipal highways, O. Reg. 239/02, s. 16.3 · current to November 11, 2026 · consolidated from May 3, 2018 · read from e-Laws on November 16, 2026
The text
(1) Subject to section 16.4, the standard for addressing snow accumulation on a sidewalk after the snow accumulation has ended is,
a) to reduce the snow to a depth less than or equal to 8 centimetres within 48 hours; and
b) to provide a minimum sidewalk width of 1 metre. O. Reg. 366/18, s. 15.
(2) If the depth of snow accumulation on a sidewalk is less than or equal to 8 centimetres, the sidewalk is deemed to be in a state of repair in respect of snow accumulation. O. Reg. 366/18, s. 15.
(3) If the depth of snow accumulation on a sidewalk exceeds 8 centimetres while the snow continues to accumulate, the sidewalk is deemed to be in a state of repair with respect to snow accumulation, until 48 hours after the snow accumulation ends. O. Reg. 366/18, s. 15.
(4) For the purposes of this section, the depth of snow accumulation on a sidewalk may be determined in the same manner as set out in subsection 4 (4) and by the persons mentioned in subsection 4 (3) with necessary modifications. O. Reg. 366/18, s. 15.
(5) For the purposes of this section, addressing snow accumulation on a sidewalk includes,
(a) plowing the sidewalk;
(b) salting the sidewalk;
(c) applying abrasive materials to the sidewalk;
(d) applying other chemical or organic agents to the sidewalk; or
(e) any combination of the methods described in clauses (a) to (d). O. Reg. 366/18, s. 15.
Read the minimum maintenance standards for municipal highways on e-Laws ↗
Made under Municipal Act, 2001, S.O. 2001, c. 25.