OPERATING ENGINEERS, O. Reg. 219/01

Section 43

Dual control boiler

Cite as OPERATING ENGINEERS, O. Reg. 219/01, s. 43 · current to November 11, 2026 · consolidated from June 27, 2001 · read from e-Laws on November 17, 2026

The text

(1) Where a plant is comprised of a dual control boiler and the power rating of the boiler is not more than 1471 kW (150 BHP, 50TH) and the dual control boiler is to be operated at a pressure of less than 15 psi (103 kpa), an operating engineer is not required to be in attendance at the plant if the plant meets the requirements of section 39 and is equipped with, (a) a hard wired low pressure control device that restricts the operating pressure of the dual control boiler to 15 psi (103 kpa); and (b) the protective devices required by section 39, so long as the high-pressure limiting device or the high temperature limiting device referred to in section 39 is set for low pressure or temperature operation. O. Reg. 219/01, s. 43 (1). (2) The results obtained from the pressure recording device attached to the dual control boiler shall be retained for a period of 12 months and shall be available to an inspector at all times. O. Reg. 219/01, s. 43 (2). (3) All protective and control devices described in subsection (1) shall be approved by the chief officer. O. Reg. 219/01, s. 43 (3).
Read the OPERATING ENGINEERS on e-Laws ↗

Made under Technical Standards and Safety Act, 2000, S.O. 2000, c. 16.