OPERATING ENGINEERS, O. Reg. 219/01
Section 3
Application
Cite as OPERATING ENGINEERS, O. Reg. 219/01, s. 3 · current to November 11, 2026 · consolidated from June 27, 2001 · read from e-Laws on November 17, 2026
The text
(1) This Regulation applies to the operation of all registered plants. O. Reg. 219/01, s. 3 (1).
(2) This Regulation does not apply to,
(a) a person who performs work in connection with a plant other than the actual operation of it;
(b) a person, other than an operating engineer or operator, engaged in installing, testing or repairing a plant;
(c) a plant that is subject to inspection by the Canadian Transport Commission or the National Energy Board;
(d) a boiler used in connection with an open-type hot water heating system having no intervening valves between the boiler and any direct vent, preventing any pressure build up above atmospheric pressure;
(e) a high or low pressure steam plant or power plant or a high or low temperature water or power plant while used in connection with any growing operation, except a growing operation being carried on in a greenhouse where a person, other than the user of the plant or his or her immediate family, is employed or works in connection with the growing operation;
(f) a boiler or an installation comprised of more than one boiler, where the boiler contains hot water at a temperature of less than 212°F (100°C);
(g) a thermal liquid heater;
(h) a compressor or refrigeration compressor that operates at a pressure of 15 psi (103 kPa) or less;
(i) a non-refrigeration compressor of the centrifugal, turbine, screw, rotary vane and rotary lobe type;
(j) a compressor situated in a remote area to which a person does not normally have access and that is controlled automatically or by remote manual control; or
(k) a mobile off shore plant. O. Reg. 219/01, s. 3 (2).
(3) On the day this Regulation comes into force, it applies to all existing registrations or certificates of persons and things, including plants, equipment, installations and operations, except as indicated in the following chart:
Section | Item | Maximum Compliance Time Allowance as from Date of Regulation | Final Date for Compliance
39 | Low water volume boilers | 3 years
Table 3 | Low water volume boilers without economizer or accumulators power rating | Existing non-attended plants as of (date of regulation) | Exempt
40 | Requirements (1) | 3 years
(2) | New only | 2001
46 | Procedure manual | 1 year
41 | Boiler water conditioning | 1 year
4 | Replacement of existing plant registration Authority | 3 years
Upon plant inspection
Table 7 | Traction operator | 1 year
Table 8 | Practical qualifying time 4th Class | Within 4 months of this Regulation
Table 5 | Refrigeration operators holding a Compressor Operator Certificate which has lapsed by the use of the Refrigeration Certificate for Compressor Operation | Must renew Compressor Operator Certificate within 6 months of this Regulation
Table 5 | Refrigeration operators cannot operate a compressor plant unless holding a Compressor Operators Certificate as of date of this Regulation | May continue to operate that specific plant | Upon moving to another compressor plant
Table 6 | Unattended allowance for >100 BHP <200 BHP for Plant Code R11 | Upon approved application following an inspection