OPERATING ENGINEERS, O. Reg. 219/01

Section 24

Staffing guarded plants

Cite as OPERATING ENGINEERS, O. Reg. 219/01, s. 24 · current to November 11, 2026 · consolidated from June 27, 2001 · read from e-Laws on November 17, 2026

The text

(1) First class plants shall not be guarded plants but may have guarded units. O. Reg. 219/01, s. 24 (1). (2) Where the user of a guarded plant complies with the requirements of section 39, 43 or 45, as the case requires, and the protective devices are functioning properly, whether the plant operates 24 hours a day or less, the user shall have one operating engineer, compressor operator or refrigeration operator, as the case may be, in accordance with Tables 2, 3, 4, 5 and 6. O. Reg. 219/01, s. 24 (2). (3) The user of a plant in which any of the following parts are installed shall ensure that, when any one of them is operated, no other part of the plant is operated unless a certified operating engineer or operator, as required by the certificate of registration for the plant, is in attendance: 1. A guarded boiler for low pressure steam or low temperature hot water. 2. A guarded boiler for high pressure steam or high temperature hot water. 3. A guarded steam prime mover. 4. A guarded compressor. 5. A guarded refrigeration compressor. O. Reg. 219/01, s. 24 (3). (4) Subsection (3) applies only to the guarded parts mentioned in it that are at least of the size prescribed in Table 2, 3, 4, 5 or 6. O. Reg. 219/01, s. 24 (4). (5) When the operating engineer or operator is absent from the guarded plant during permitted periods, access to it must be controlled and secure to prevent unauthorized access and must be signed to this effect at all entrances. O. Reg. 219/01, s. 24 (5).
Read the OPERATING ENGINEERS on e-Laws ↗

Made under Technical Standards and Safety Act, 2000, S.O. 2000, c. 16.