OPERATING ENGINEERS, O. Reg. 219/01
Section 12
Reduction of the power rating of a plant
Cite as OPERATING ENGINEERS, O. Reg. 219/01, s. 12 · current to November 11, 2026 · consolidated from June 27, 2001 · read from e-Laws on November 17, 2026
The text
(1) Where a user intends to reduce the power rating of a plant, the user shall notify the chief officer of the intention to have the rating reduced. O. Reg. 219/01, s. 12 (1).
(2) The power rating of a plant may be reduced by the isolation of a boiler, prime mover, compressor, refrigeration plant or by any other reasonable means and, where the power rating is so reduced, an inspector shall affix a seal or seals to the reduced unit or any part of the plant in such a manner that no increase to the new power rating of the plant may be made without removing the seal. O. Reg. 219/01, s. 12 (2).
(3) Where the output of a boiler is permanently reduced by the welding of blanking plates to the tubes, an inspector is not required to affix a seal to the boiler as required under subsection (2). O. Reg. 219/01, s. 12 (3).
(4) A reduction in the fuel supply to a burner shall be made by an approved method that allows for a seal attachment. O. Reg. 219/01, s. 12 (4).
(5) The user shall pay the fees set by the designated administrative authority for the affixing or removal of a seal. O. Reg. 219/01, s. 12 (5).
(6) No person shall operate a boiler, prime mover, compressor or refrigeration compressor unless the power rating of all units is included in the total power rating of the plant. O. Reg. 219/01, s. 12 (6).
Read the OPERATING ENGINEERS on e-Laws ↗
Made under Technical Standards and Safety Act, 2000, S.O. 2000, c. 16.