FUEL OIL, O. Reg. 213/01

Section 16

Design registration

Cite as FUEL OIL, O. Reg. 213/01, s. 16 · current to November 11, 2026 · consolidated from June 27, 2001 · read from e-Laws on November 17, 2026

The text

(1) Except as provided in subsection (4), a person who plans to construct a central oil distribution system or facility or to make a modification to it shall submit drawings in triplicate of the proposed system or facility to the director for registration. O. Reg. 213/01, s. 16 (1). (2) The drawings shall be submitted before the construction or modifications begin. O. Reg. 213/01, s. 16 (2). (3) Upon registering the drawings, the director shall return one copy of them to the applicant. O. Reg. 213/01, s. 16 (3). (4) A person may prepare drawings for the construction or modification of a system or facility under subsection (1) and may, despite that subsection, submit only one copy if, (a) a professional engineer has reviewed them, stamped them with his or her seal and signed them; (b) the professional engineer has submitted a declaration to the director that the drawings are in compliance with the requirements of this Regulation; and (c) a copy of the drawings is kept at all times at the facility while the construction or modification is being carried out. O. Reg. 213/01, s. 16 (4). (5) In this section, “professional engineer” means a person licensed under the Professional Engineers Act. O. Reg. 213/01, s. 16 (5).
Read the FUEL OIL on e-Laws ↗

Made under Technical Standards and Safety Act, 2000, S.O. 2000, c. 16.