Underground Mine, N.B. Reg. 96-105

Section 226

Signals for hoist movement

Cite as Underground Mine, N.B. Reg. 96-105, s. 226 · current to July 26, 2024 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) An employer shall ensure that a signal for hoist movement is given only (a) by an employee competent and authorized to give signals, and (b) when the shaft conveyance or counterweight is at the same location as the employee signalling, except during (i) shaft sinking and preliminary shaft development, or (ii) maintenance work in a shaft. (2) A hoist operator shall ensure that a hoist is not moved on manual control unless (a) the signal prescribed under this section is given, (b) the signal is returned by the hoist operator, and (c) at least five seconds have elapsed after the executive signal has been given. (3) An employer shall ensure that signals are given in the following sequence when a hoist is moved under manual control: (a) cautionary; (b) destination; and (c) executive. (4) An employer shall ensure that the following basic code of signals to a hoist operator is used: (a)where the shaft conveyance is moving, stop immediately | 1 signal (b)where the shaft conveyance is stationary, hoist | 1 signal (c)lower | 2 signals (d)persons entering or leaving a shaft conveyance | 3 signals (e)caution - blasting to take place | 4 signals (f)release of shaft conveyance | 5 signals (g)emergency | 9 signals (h)chairing | 1 signal followed by 2 signals (i)hoist slowly | 3 signals followed by 3 signals followed by 1 signal (j)lower slowly | 3 signals followed by 3 signals followed by 2 signals (5) An employee authorized to give signals shall comply with the signals prescribed in subsection (4). (6) The following procedure shall be followed after 4 signals: (a) the hoist operator shall answer after 4 signals by raising the shaft conveyance a few feet and then lowering it slowly; (b) following 4 signals, only 1 signal is required to signal for raising personnel away from a blast; and (c) the hoist operator shall remain at the controls until the act of raising the shaft conveyance has been completed. (7) Where it is necessary for the operation of a shaft conveyance, the supervisor in charge of an underground mine may establish signals in addition to those prescribed in subsection (4). (8) An employer shall ensure that the basic code of signals and the signals established under subsection (7) are posted in every hoist room, working level, landing deck and cage.
Read the Underground Mine on the Province's website ↗

Made under Occupational Health and Safety Act, c. O-0.2.