General, N.B. Reg. 95-66
Section 12
Rehabilitation
Cite as General, N.B. Reg. 95-66, s. 12 · current to December 18, 2020 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) A holder of a permit other than one issued in respect of a development or undertaking shall, within the period of time indicated in this section, institute and complete the rehabilitation plan submitted with the application for the permit, as approved by the Minister.
(2) The rehabilitation of the topsoil removal site shall, subject to paragraph (e), be completed by the end of the year in which a permit is issued, if the site is subject to flooding, and shall be completed by six months after the end of the year in which a permit is issued, if the site is not subject to flooding, and shall include
(a) removal of all equipment, buildings and structures placed or erected on the site for the purpose of topsoil removal,
(b) removal, or even distribution over the site, of any stockpiles and any soil, gravel, rock or other material that has been moved from its original location in the ground,
(c) clearing of all debris from the site,
(d) if the removal leaves any excavation more than one metre in depth, tapering of the slopes of the excavation to an angle not steeper than four horizontal to one vertical for the full depth,
(e) if the site is subject to flooding, seeding of those areas of the site that have been stripped with grass or other vegetation before the end of August in a manner and to an extent acceptable to the Minister in order to prevent soil erosion,
(f) if the site is not subject to flooding, seeding of those areas of the site that have been stripped with grass or other vegetation in a manner and to an extent acceptable to the Minister in order to prevent soil erosion, and
(g) management of the site in order to ensure that the grass or vegetation is maintained for a period of at least two years.
(3) Notwithstanding subsection (2), equipment, buildings and structures referred to in paragraph (2)(a) may remain on a site that is not subject to flooding if the person applies for and receives a topsoil removal permit in respect of the same site before the first day of July in the following calendar year.
(4) Where a topsoil permit for the removal of topsoil is issued in respect of a development or undertaking, the permit is subject to such terms and conditions respecting rehabilitation of the land that the Minister may impose under subsection 5(2).
Read the General on the Province's website ↗
Made under Topsoil Preservation Act, 2011, c.230.