General, N.B. Reg. 95-66
Section 10
Terms and conditions of topsoil removal permit
Cite as General, N.B. Reg. 95-66, s. 10 · current to December 18, 2020 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) A topsoil removal permit that is issued pursuant to an application in respect of which there is no proposed development or undertaking is subject to the following terms and conditions:
(a) if the parcel has not been subdivided on or after May 1, 1995, and if a total of two hectares or more of the parcel has been used for agricultural production at any time during the twenty years previous to the date of the issuance of the permit, the holder and the employees and agents of the holder, and no other person, may remove topsoil from the parcel only until, and never after, the total area of the parcel from which topsoil has been removed is five per cent of the total area of the parcel or two hectares, whichever is the lesser;
(b) if the parcel was on May 1, 1995, part of another parcel and if a total of two hectares or more of the other parcel as constituted on May 1, 1995, has been used for agricultural production at any time during the twenty years previous to the date of the issuance of the permit, the holder and the employees and agents of the holder, and no other person, may remove topsoil from the parcel in respect of which the permit is issued only until, and never after, the sum of the total area of the topsoil removed from the parcel for which the permit is issued together with the area of topsoil removed from any other parcel that was part of the other parcel as constituted on May 1, 1995, is five per cent of the total area of the other parcel as constituted on May 1, 1995, or two hectares, whichever is the lesser;
(c) the holder shall not remove or authorize or permit any person to remove topsoil from any area that is below the top level of the water table at the time of removal;
(d) if the site of the removal is subject to flooding, the holder shall not remove or authorize or permit any person to remove topsoil after the thirty-first day of July in any year and shall ensure that the site is rehabilitated and seeded with a cover crop in a manner and to an extent acceptable to the Minister before the end of August in the same year;
(e) if the site of the removal or any portion of the parcel on which the topsoil is stockpiled is subject to flooding, the holder shall ensure that all such stockpiles are removed by the thirty-first day of October in the same year;
(f) the holder shall ensure that the removal is carried out in such a way as to minimize erosion of the soil and to control the direct runoff of sediment into watercourses, using settling ponds if necessary;
(g) the holder shall ensure that the removal does not create a threat of injury to any person, result in damage to adjoining or nearby properties, adversely affect a wastewater removal system, watercourse or railway, street, road or other right-of-way, create permanent ponding, cause soil erosion, result in the release of a contaminant into or otherwise adversely affect the environment or render the rehabilitation of the site impracticable;
(h) the holder shall ensure that the depth of the unconsolidated material naturally remaining over consolidated material after the completion of the removal is at least fifteen centimetres;
(i) the holder shall ensure that the operation is carried out in accordance with the provisions of the operation plan provided with the application for the permit, as approved by the Minister;
(j) the holder shall ensure that the site of the operation is rehabilitated before the expiration of any applicable deadline in accordance with the rehabilitation plan provided with the application for the permit, as approved by the Minister; and
(k) the holder shall otherwise ensure that the removal and rehabilitation are carried out in accordance with the Act and this Regulation.
(2) A topsoil removal permit that is issued pursuant to an application made in respect of a development or undertaking is subject to the terms and conditions set out in paragraphs (1)(f), (g) and (k).
Read the General on the Province's website ↗
Made under Topsoil Preservation Act, 2011, c.230.