Water Well, N.B. Reg. 90-79

Section 32

Cite as Water Well, N.B. Reg. 90-79, s. 32 · current to June 13, 2012 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) No well driller shall complete the construction of a well without performing an adequate test to determine the rate of yield of the well, which shall be carried out in accordance with the water well construction and testing procedures determined by the Minister. (2) If a well is intended to supply water as part of a public water supply, testing of the well shall be carried out in accordance with the requirements of the Minister, which may include construction of observation wells for proper measurement of the well and aquifer properties. (3) The minimum requirements for the testing of public water supply wells include a development period, a stage drawdown test and a constant rate test, all including water level measurements in the well and in at least one observation well, which measurements shall be continued after pumping has stopped until such time as the recovery curve can be identified. (4) If a well is intended to supply water for any purpose other than that described in subsection (2) to meet a demand in excess of fifty cubic metres per day, a pumping test of not less than twenty-four hours duration shall be conducted. (5) If a well is intended solely to supply water for household purposes to not more than one single family dwelling unit or to produce not more than fifty cubic metres of water per day, a yield test of not less than one hour duration shall be carried out in accordance with the water well construction and testing procedures determined by the Minister. (6) Water level measurements shall be made before, during and after the pumping test and sufficient measurements of water levels shall be made immediately after pumping stops to establish the recovery curve.
Read the Water Well on the Province's website ↗

Made under Clean Water Act, c. C-6.1.