Petroleum Product Storage and Handling, N.B. Reg. 87-97

Section 90

Cite as Petroleum Product Storage and Handling, N.B. Reg. 87-97, s. 90 · current to June 13, 2012 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) The walls and floor of a dike and diked area, including any interconnecting channel and the area beneath a storage tank, shall be (a) made of earth, steel, concrete or other material that is designed, constructed and maintained to be liquid tight to a permeability of 1 times 10-7 centimetres per second and to withstand the full hydrostatic head, in spite of atmospheric influences, and (b) adequately protected to maintain their integrity during construction and servicing of the area. (2) The impermeable layer of the walls and floor of a dike and diked area made of earth, clay or other natural material shall be at least four hundred millimetres thick. (3) Where necessary, the water table shall be lowered before construction of a dike or diked area and shall be kept lowered so that no portion of a dike or diked area, including any interconnecting channel and the area beneath an aboveground storage tank, is below the water table at any time of the year. (4) No piping shall pass through the wall of a dike referred to in section 87 other than for the purpose of drainage or where the permission of the Minister has been obtained before construction of the piping. (5) Where piping passes through a wall of a dike as provided for in subsection (4), the passage shall be designed, constructed and maintained to prevent seepage from the diked area and excess pressure or stress on the piping as a result of settlement or fire exposure. (6) Subject to subsection (4), piping passing from one side of the wall of a dike to the other shall pass over the wall and shall be constructed and supported so that leakage from the piping cannot occur.
Read the Petroleum Product Storage and Handling on the Province's website ↗

Made under Clean Environment Act, c. C-6.