Petroleum Product Storage and Handling, N.B. Reg. 87-97
Section 172
Cite as Petroleum Product Storage and Handling, N.B. Reg. 87-97, s. 172 · current to June 13, 2012 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) Subject to subsection (6), maintenance shall not be carried out on a piping system while it is under pressure.
(2) All petroleum product shall be drained from the piping system before connections or piping are opened.
(3) Where equipment for handling a petroleum product must be repaired, it shall be removed from the system and taken to maintenance areas when possible.
(4) Tags and lockouts shall be attached to all valves on piping systems that are shut off for maintenance purposes to indicate that such valves are not to be opened.
(5) Subject to section 246, piping that has been used for the transfer of a petroleum product shall be removed or capped when it is no longer intended to be used.
(6) Connections to pressurized piping systems shall be made in conformance with the practice
(a) provided for under the Boiler and Pressure Vessel Act,
(b) described in API Publication No. 2200, Second Edition, April, 1983, “Repairing Crude Oil, Liquified Petroleum Gas, and Product Pipelines”, or
(c) described in API Publication No. 2201, Third Edition, October, 1985, “Procedures For Welding or Hot Tapping On Equipment Containing Flammables”,
or with other practice acceptable to the Minister.
Read the Petroleum Product Storage and Handling on the Province's website ↗
Made under Clean Environment Act, c. C-6.