Petroleum Product Storage and Handling, N.B. Reg. 87-97
Section 157
Cite as Petroleum Product Storage and Handling, N.B. Reg. 87-97, s. 157 · current to June 13, 2012 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) All underground piping shall be supported on at least one hundred and fifty millimetres of clean compacted sand, pea gravel or washed, crushed stone in conformance with the manufacturer’s specifications.
(2) Underground steel piping shall be backfilled on the top and sides with at least three hundred millimetres of clean compacted sand, free of clay, cinders, stones and any foreign matter and compacted in layers not greater than three hundred millimetres thick, in accordance with the manufacturer’s recommendations.
(3) Underground fiberglass piping shall be backfilled on the top and sides with at least three hundred millimetres of pea gravel or clean crushed stone, in accordance with the manufacturer’s recommendations.
Read the Petroleum Product Storage and Handling on the Province's website ↗
Made under Clean Environment Act, c. C-6.