General, N.B. Reg. 86-98

Section 35

Prohibitions on excavation and quarrying operations

Cite as General, N.B. Reg. 86-98, s. 35 · current to March 30, 2026 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) Unless the owner of an excavation operation and the adjoining property owners make an agreement in writing, no owner of an excavation operation shall carry on the excavation operation in sand, gravel or clay or other natural unconsolidated material within a distance from the property boundary of half the height of the total pit face, and no material that sloughs from within this distance shall be removed. (2) Unless the owner of a quarrying operation and the adjoining property owners make an agreement in writing, no owner of a quarrying operation shall carry on the quarrying operation in an open-cast rock quarry within a distance of six metres from the property boundary. (3) Unless the owner of an excavation operation and the owner of the right of way make an agreement in writing, no owner of an excavation operation shall establish or extend the excavation operation within a distance of fifteen metres from a right of way for a public road, railway, pipe line, transmission line or other utility. (4) The owner of an excavation operation or quarrying operation shall file a copy of an agreement referred to in subsection (1), (2) or (3) with the Minister within fifteen days after the date of the signing of the agreement.
Read the General on the Province's website ↗

Made under Mining Act, c. M-14.1.