Geophysical Exploration, N.B. Reg. 86-191

Section 38

Cite as Geophysical Exploration, N.B. Reg. 86-191, s. 38 · current to December 20, 2019 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) A permittee shall ensure that a shothole or testhole that has not been permanently abandoned (a) is temporarily abandoned in accordance with section 1 or 2 of Schedule D, as the case may be, and (b) is not left unattended until it is temporarily abandoned. (2) Within 30 days after an explosive charge has been loaded in a shothole, the permittee shall ensure that the charge is detonated. (3) Immediately after the explosive charge is detonated in a shothole, the permittee shall ensure that the shothole is permanently abandoned in accordance with section 3 of Schedule D. (4) Within 30 days after the date on which the drilling of a testhole is completed, the permittee shall ensure that the testhole is permanently abandoned in accordance with section 4 of Schedule D. (5) The Minister may extend the periods of time referred to in subsections (2) to (4).
Read the Geophysical Exploration on the Province's website ↗

Made under Oil and Natural Gas Act, c. O-2.1.