Geophysical Exploration, N.B. Reg. 86-191

Section 34

Cite as Geophysical Exploration, N.B. Reg. 86-191, s. 34 · current to December 20, 2019 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

No permittee shall deploy a seismic non-explosive energy source except in accordance with the following table: Structure | Setback(m) Building or structure with a concrete base, residence, barn, concrete irrigation structure, concrete-lined irrigation canal or concrete water pipeline | 50 Water well, artificial water hole or developed spring | 100 Driveway, gateway, buried water pipeline (other than a concrete-lined pipeline), buried telephone or telecommunications line or survey monument | 5 Irrigation canal (other than a concrete-lined canal) | 10 Cemetery | 50 Petroleum or natural gas pipeline (measured from the centre line of the pipeline) or a petroleum or natural gas well | 15
Read the Geophysical Exploration on the Province's website ↗

Made under Oil and Natural Gas Act, c. O-2.1.