Geophysical Exploration, N.B. Reg. 86-191
Section 3
Cite as Geophysical Exploration, N.B. Reg. 86-191, s. 3 · current to December 20, 2019 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) An application for a geophysical licence shall be on a form provided by the Minister and shall be accompanied by
(a) a preliminary plan, in duplicate, of the proposed geophysical exploration, for approval by the Minister;
(b) the fee set out in Schedule A;
(c) the security deposit as set out in Schedule B;
(d) a statement of the projected cost of the proposed geophysical exploration program; and
(e) such other information as the Minister may require.
(2) The preliminary plan referred to in subsection (1) shall
(a) be of a scale not smaller than 1:50,000;
(b) outline the area in which the geophysical exploration is to be undertaken and show the location in accordance with the Oil and Natural Gas Survey System; and
(c) show the approximate location of
(i) existing roads and highways to be used for access to the exploration area,
(ii) existing lines and trails to be used,
(iii) proposed lines and trails to be cleared or bulldozed, and
(iv) proposed campsites and landing strips where appropriate.
(3) Where, in the Minister’s opinion, the proposed geophysical exploration will result in the clearing or bulldozing of more new lines and trails than are necessary for the geophysical exploration, the Minister may, by giving the applicant notice, make his approval of the preliminary plan conditional upon
(a) an increase in the security deposit; and
(b) all or part of the lines and trails proposed on the preliminary plan, as specified by the Minister, not being bulldozed or cleared.
Read the Geophysical Exploration on the Province's website ↗
Made under Oil and Natural Gas Act, c. O-2.1.