The text

(1) Except as otherwise provided in the Act and this Regulation, a power engineer holding a power engineers licence of the class prescribed for the heating plant or power plant shall be in attendance at all times while the boiler is in operation. (2) During the temporary period of absence of the power engineer holding a power engineers licence of the class prescribed for any heating plant or power plant, the Chief Inspector may authorize, in writing, a power engineer holding a power engineers licence of not more than one class lower to act in his stead for a period of ninety days or less. (3) Where one or more holders of any class of power engineers licence are employed to operate a heating plant or power plant on each shift, the employer shall designate one of them as having charge of the heating plant or power plant. (4) No employer shall permit an employee who is employed by him as a power engineer to engage during working hours in any labour or pursuit not immediately connected with the operation of the heating plant or power plant that would interfere with the safe operation of the heating plant or power plant. (5) If a power engineer engages during working hours in a labour or pursuit not immediately connected with the operation of a heating plant or power plant, the chief inspector shall determine whether such labour or pursuit interferes with the safe operation of the heating plant or power plant.
Read the Heating Plants and Power Plants on the Province's website ↗

Made under Boiler and Pressure Vessel Act, 2011, c.122.