Heating Plants and Power Plants, N.B. Reg. 84-175
Section 11
Cite as Heating Plants and Power Plants, N.B. Reg. 84-175, s. 11 · current to October 1, 2014 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
(1) The therm-hour rating of a boiler, other than an electric boiler, that is installed, re-installed or altered after July 14, 1976 is the maximum number of British Thermal Units in the total heat content of the water or steam entering its inlet subtracted from the total heat content of the water or steam leaving its outlet per hour, as determined by its manufacturer for its normal, continuous operation, divided by 100,000.
(2) The therm-hour rating of an electric boiler that is installed, re-installed or altered after July 14, 1976 is the maximum number of kilowatts supplied to the boiler per hour, as determined by its manufacturer for its normal, continuous operation, multiplied by 3413 and divided by 100,000.
Read the Heating Plants and Power Plants on the Province's website ↗
Made under Boiler and Pressure Vessel Act, 2011, c.122.