The text

(1) Repealed: 98-54 (1.1) Repealed: 98-54 (2) Repealed: 98-54 (3) Subject to subsection (4), an electrical installation shall include all the circuits normally supplied through the service box of a service entrance but in any building where two or more service boxes are connected to a common service entrance supply, there shall be as many electrical installations as the number of service boxes. (4) In any multiple occupancy building where the main service entrance subdivides to supply three or more occupancies, the main service entrance circuit shall be considered as being a type III installation, while each occupancy shall be considered separately as being a type II installation or a type III installation according to the features of each type of installation as defined in section 2. (5) Temporary electrical installations for construction purposes shall be considered as separate electrical installations and at no time shall such temporary electrical installations be interconnected with any of the circuits of the permanent electrical installation under construction, except where special approval has been granted by the Chief Electrical Inspector. (6) Temporary electrical installations for construction purposes shall not remain energized beyond six months, except where special approval has been granted by the Chief Electrical Inspector.
Read the General on the Province's website ↗

Made under Electrical Installation and Inspection Act, 2011, c.144.