General, N.B. Reg. 84-165

Section 23

Cite as General, N.B. Reg. 84-165, s. 23 · current to August 1, 2026 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(0.1) In this section, “overtime” means time worked on a Saturday or holiday and any time worked after 5:00 p.m. of any day and before 8:00 a.m. of the following day. (1) The charges for electrical contractors licences are as follows: (a) for the issuance or a renewal of an Electrical Contractors Licence Group 3 - $400; and (b) for the renewal of an Electrical Contractors Licence Group 2 - $250. (2) The charges for electricians licences are as follows: (a) for the issuance or a renewal of an Electricians Licence Class 3 - $50; (b) for the renewal of an Electricians Licence Class 2 - $50; and (c) for the issuance or a renewal of an Industrial Electricians Licence - $50. (2.1) The charge for the issuance or renewal of a Sign Installer Contractors Licence is $100. (2.2) The charges for sign installers licences are as follows: (a) for the issuance of a Sign Installers Licence - $100; and (b) for the renewal of a Sign Installers Licence - $50. (3) The charge for an identification card issued under subsection 11(6) is $50. (3.1) The charge for the issuance or renewal of a Sign Installer Helpers Identification Card is $50. (4) Repealed: 2003-64 (5) Subject to subsection (6.1), the charge for a special inspection of an electrical installation is $300 per hour or any part of an hour, with a minimum charge of $300. (6) Subject to subsection (6.1), the charge for the approval of plans for a type III installation shall be according to the ampere and voltage rating of the installation at the following rates: (a) 401 amperes or greater, 120/240 volts single phase, 201 to 400 amperes, 120/208 volts three phase, 101 to 200 amperes, 347/600 volts three phase - $100 per hour or any part of an hour, with a minimum charge of $100; (b) 401 to 2000 amperes, 120/208 volts three phase, 201 to 1000 amperes, 347/600 volts three phase - $100 per hour or any part of an hour, with a minimum charge of $100; and (c) all others - $100 per hour or any part of an hour, with a minimum charge of $100. (6.1) The fees under subsections (5) and (6) shall be $400 per hour or any part of an hour for inspections done during overtime, with a minimum charge of $400. (6.2) Despite subsections (6) and (6.1), the fee for the approval of the plans and specifications for a type III installation referred to in subsection 17(2) is $100. (7) The charges, per electrical installation, for special wiring permits for carnivals and exhibitions, shows or other such presentations are as follows: (a) for 50 K.V.A. or less, 200 amperes or less, 120/240 volts single phase or 120/208 volts three phase, $335; (b) for 72 amperes or less, 240 to 600 volts, $335; (c) for 51 to 100 K.V.A., 201 to 400 amperes, 120/240 volts single phase or 120/208 volts three phase, $500; (d) for 120 amperes or less, 240 to 600 volts, $500; and (e) for all electrical installations over 100 K.V.A. and for all electrical installations that are in excess of the amperes and volts referred to in paragraphs (a) to (d), $670. (7.1) The charge for a special wiring permit for an emergency repair or for meter detachment and reattachment for siding installation is $85. (8) The charges for wiring permits are as follows: (a) for temporary installations for construction that are (i) 200 amperes or less, 120/240 volts single phase or 120/208 volts three phase, $100, (ii) 72 amperes or less, 347/600 volts three phase, $100, (iii) 201 to 400 amperes, 120/240 volts single phase or 120/208 volts three phase, $210, (iv) 73 to 200 amperes, 347/600 volts three phase, $210, (v) 401 to 600 amperes, 120/240 volts single phase or 120/208 volts three phase, $290, (vi) 201 to 400 amperes, 347/600 volts three phase, $290, and (vii) all others, $500; (b) for all type II installations and type III installations up to and including the first 50 K.V.A. that do not require a new service connection, $195; (c) for all type II installations and type III installations up to and including the first 50 K.V.A. that require a new service connection, $195; (d) for type III installations in excess of 50 K.V.A., $3 per K.V.A for the first 1 000 K.V.A., then $2 per K.V.A. thereafter; (e) notwithstanding paragraphs (b), (c) and (d), for service entrance relocations, $195; (f) for sign installation work (i) for a single sign at a location, $125, or (ii) for two or more signs at a location, $125 for the first sign, plus $15 for each additional sign. (9) A K.V.A. rating is derived from one of the following formulas: (a) Single Phase K.V.A. = Volts × Amperes; 1000 or (b) Three Phase K.V.A. = 1.73 × Volts × Amperes; 1000 (10) When an existing type III installation of four hundred amperes or more is increased in capacity to supply a greater connected load, installed or proposed, the true K.V.A. rating for the purpose of determining the charge under paragraphs (8)(b) and (c) shall be the total final capacity of the installation less the capacity of the installation before the start of construction under the wiring permit concerned. (11) The charge for wiring permits for multiple occupancy installations as defined in subsection 4(4) shall be according to the K.V.A. rating of the main service entrance plus fifty per cent of the applicable charge for each single occupancy type II installation or type III installation subdivision of the main service entrance, but where a change in the service entrance is not required, the charge for wiring permits for alterations and additions shall be in accordance with subsection (8).
Read the General on the Province's website ↗

Made under Electrical Installation and Inspection Act, 2011, c.144.