Pipeline, N.B. Reg. 2006-2
Schedule A
Cite as Pipeline, N.B. Reg. 2006-2, Schedule A · current to December 18, 2020 · read from New Brunswick Acts and Regulations on November 16, 2026
The text
Modifications to CSA Z662-19 applicable in the Province
1 Clause 10.6 is amended by adding the following clause:
10.6.5 Right-of-Way Encroachment
10.6.5.1 No person shall construct, erect or install any structure or tangible item on or within the pipeline right-of-way, including but not limited to patios, concrete slabs, buildings, pool houses, garden sheds, swimming pools, hot tubs, fish or other man-made ponds, saunas or fences, unless written permission is first obtained from the operating company.
10.6.5.2 No person shall deposit or store any flammable material, solid or liquid spoil, refuse, waste or effluent on or within the pipeline right-of-way.
10.6.5.3 Notwithstanding the above, operating companies may erect structures required for the purpose of pipeline system operation on the pipeline right-of-way.
10.6.5.4 No person shall operate a vehicle or mobile equipment except for farm machinery or personal recreation vehicles across or within a pipeline right-of-way unless written permission is first obtained from the operating company or the vehicle or mobile equipment is operated within the travelled portion of a highway or public road already existing in the pipeline right-of-way.
10.6.5.5 Operating companies shall develop written procedures for periodically determining the depth of cover for pipelines operated over 30% of SMYS of the pipe at MOP. Such written procedures shall include a rationale for the frequency selected for such depth determinations. Where the depth of cover is found to be less than 60 cm in lands being used for agriculture, an engineering assessment shall be done in accordance with clause 3.3 and a suitable mitigation plan shall be developed and implemented to ensure the pipeline is adequately protected from hazards.
2 Clause 12.4.11.1 is renumbered as clause 12.4.11.1.1. Clause 12.4.11 is amended by adding the following clauses:
12.4.11.1.2 All new and replacement natural gas service regulators shall comply with the requirements of CSA 6.18-02 (R2017) (Service Regulators for Natural Gas), published by the Canadian Standards Association, including the Drip and Splash Test contained in Appendix A of the said standard. Where a regulator-meter set installation or supplemental protective device providing equivalent protection against regulator vent freeze up passes a successful test in accordance with Appendix C of the said standard, the requirements of Appendix A (Drip and Splash Test) and those contained in clause 14.15 (Freezing Rain Test) of the standard are waived. Evidence of tests completed in accordance with Appendix C of the standard shall be retained by the operating company as permanent records.
12.4.11.1.3 Regulator-meter set configurations shall be included in the operating company’s operating and maintenance procedures.
Read the Pipeline on the Province's website ↗
Made under Pipeline Act, 2005, c. P-8.5.