Pipeline, N.B. Reg. 2006-2

Section 4

Applicable standards and specifications

Cite as Pipeline, N.B. Reg. 2006-2, s. 4 · current to December 18, 2020 · read from New Brunswick Acts and Regulations on November 16, 2026

The text

(1) When a corporation designs, constructs, operates or abandons a pipeline, or contracts for the provision of those services, the corporation shall ensure that the pipeline is designed, constructed, operated or abandoned in accordance with the applicable provisions of (a) this Regulation; (b) CSA Z276, if the pipeline transports liquefied natural gas; (c) CSA Z341 for the underground storage of hydrocarbons; and (d) CSA Z662, if the pipeline transports liquid or gaseous hydrocarbons or minerals as defined in the Act. (2) The corporation shall ensure that the pipeline is designed, constructed, operated or abandoned in accordance with the designs, specifications, programs, manuals, procedures, measures and plans developed and implemented by the corporation in accordance with this Regulation. (3) If there is an inconsistency between this Regulation and a standard referred to in paragraph (1)(b) to (d), this Regulation prevails to the extent of the inconsistency. (4) If a standard referred to in paragraph (1)(b) to (d) is amended, a corporation is not required to comply with the amendment until six months, or such other period as the Board may fix, after the date when it is made.
Read the Pipeline on the Province's website ↗

Made under Pipeline Act, 2005, c. P-8.5.