Permit Regulation, B.C. Reg. 99/2013
Section 7
Producing mines
Cite as Permit Regulation, B.C. Reg. 99/2013, s. 7 · last amended January 25, 2021 · read from BC Laws on November 17, 2026
The text
(1) In this section:
“exploration drill program” means a mineral or coal exploration drill program;
“producing mine” means a mine
(a) for which a permit has been issued under the Act for production of minerals or coal, and
(b) that is currently operating.
(2) A permit for a producing mine is deemed to authorize the permittee to conduct both an exploration drill program and an IP survey.
(3) A permittee must give, in accordance with section 4, notice of the intention to conduct an exploration drill program or IP survey not otherwise referred to in the permit to the chief permitting officer no less than 30 days before beginning the exploration drill program or IP survey.
(4) An exploration drill program or IP survey not otherwise referred to in a permit may be conducted only within the area of land that would be or has been disturbed by a mine or mining activities approved under the permit.
Read the Permit Regulation on BC Laws ↗
Made under Mines Act, RSBC 1996, c. 293.