Net Profit Royalty Regulation, B.C. Reg. 98/2008

Section 10

Reclamation and remediation cost bank

Cite as Net Profit Royalty Regulation, B.C. Reg. 98/2008, s. 10 · last amended November 1, 2022 · read from BC Laws on November 17, 2026

The text

(1) Each producer that has incurred allowed capital costs and allowed operating costs for a project during the project reclamation period has, for that project, a reclamation and remediation cost bank. (2) The balance in a producer's reclamation and remediation cost bank for a project at the end of a calendar month that is within the project reclamation period is equal to the amount determined by the following formula: A + B − C where A means the balance for a producer, if any, in the reclamation and remediation cost bank for the project at the end of the immediately preceding calendar month, B means an amount, for the calendar month, equal to the sum of a producer's (i) allowed capital costs multiplied by a factor of 1.01, and (ii) allowed operating costs multiplied by a factor of 1.10, and C means the amount, if any, designated by the producer under section 10 (3) to be deducted in the calendar month from the producer's reclamation and remediation cost bank. (3) For a calendar month in the project reclamation period, a producer may designate an amount not greater than A + B under section 10 (2) to be deducted from the reclamation and remediation cost bank in calculating net revenue for any calendar month or calendar months that are within 72 calendar months of the calendar month first referred to in this subsection.
Read the Net Profit Royalty Regulation on BC Laws ↗

Made under Petroleum and Natural Gas Act, RSBC 1996, c. 361.