Petroleum and Natural Gas Act, RSBC 1996, c. 361
Section 60
Notice to drill
Cite as Petroleum and Natural Gas Act, RSBC 1996, c. 361, s. 60 · read from BC Laws on November 17, 2026
The text
(1) If the minister believes a lease location is not being developed sufficiently, the minister may, except during the 3 years after the date of issue of the lease, require the holder of the lease to submit, within 30 days from the date of the request, a plan for the development of the lease location.
(2) If the holder of a lease does not comply, or if the minister believes that a development plan submitted is not adequate for the purposes of developing a lease location, the minister may give notice to the holder requiring the holder, subject to the Energy Resource Activities Act, to begin the drilling of a well on the lease location.
(3) A notice under subsection (2) may specify a spacing area in the lease location in which the well is to be drilled, the depth to which the well is to be drilled and the time within which the drilling of the well is to begin but in specifying the period of time to begin the drilling, the minister will give regard to the accessibility of the lease location, and to the availability of drilling equipment, and in no event must the notice be less than 3 months.
(4) On receiving the notice the lease holder must
(a) begin drilling the well on the location of the lease and in the time specified in the notice and after that continuously and diligently drill the well, or
(b) surrender all of the location of the lease except eligible spacing areas as defined in section 58 (1) or 61.1 (1).
(5) If a well has been drilled pursuant to a notice and has been abandoned or completed in accordance with the Energy Resource Activities Act, the minister may at any time, except during the 6 months following the date of the abandonment or completion, order the drilling of another well on the lease location in accordance with the Energy Resource Activities Act.
Read the Petroleum and Natural Gas Act on BC Laws ↗