Renewable Energy Projects (Streamlined Permitting) Regulation, B.C. Reg. 93/2025
Section 1
Definitions
Cite as Renewable Energy Projects (Streamlined Permitting) Regulation, B.C. Reg. 93/2025, s. 1 · last amended July 10, 2026 · read from BC Laws on November 17, 2026
The text
In this regulation:
“Act” means the Renewable Energy Projects (Streamlined Permitting) Act;
“high-output”, in relation to a wind or solar energy project, means a project with a rated nameplate capacity greater than 5 MW;
“land-based”, in relation to a wind energy project, means a project with turbines that are all located on land other than land covered by water;
“Nass Valley Transmission Line project” means the project to construct and operate an electric transmission line, and related facilities, from around the proposed Ksi Lisims LNG facility to around the electric transmission line to be constructed in the North of Terrace Transmission Line project;
“North Montney Transmission Line project” means the project to construct and operate an electric transmission line, and related facilities, from around the Site C Dam northwest no farther than the Buckinghorse River;
“North of Terrace Transmission Line project” means the project to construct and operate an electric transmission line, and related facilities, from around Terrace to around Bob Quinn Lake.