The text

In this regulation: “Act” means the Energy Resource Activities Act; “ammonia facility” has the same meaning as in section 1 of the Processing Facility Regulation; “Class A ammonia facility” means an ammonia facility with a maximum manufacturing capacity of less than 5 000 tonnes of ammonia per year; “Class A hydrogen facility” means (a) a Class 1 hydrogen facility as defined in section 1 (1) of the Hydrogen Facility Regulation, or (b) a Class 2 hydrogen facility as defined in section 1 (1) of the Hydrogen Facility Regulation; “Class A LNG facility” means an LNG facility with a capacity to process no more than 1.4 million m3/day of natural gas; “Class A methanol facility” means a methanol facility with a maximum manufacturing capacity of less than 5 000 tonnes of methanol per year; “Class A natural gas facility” means a natural gas facility with a capacity to process no more than 1.4 million m3/day of natural gas; “Class A pipeline” means a pipeline with an outside diameter of less than 168.3 mm; “Class B ammonia facility” means an ammonia facility with a capacity to manufacture 5 000 tonnes or more of ammonia per year; “Class B hydrogen facility” means a Class 3 hydrogen facility as defined in section 1 of the Processing Facility Regulation; “Class B LNG facility” means an LNG facility with a capacity to process more than 1.4 million m3/day but no more than 5.6 million m3/day of natural gas; “Class B methanol facility” means a methanol facility with a capacity to manufacture 5 000 tonnes or more of methanol per year; “Class B natural gas facility” means a natural gas facility with a capacity to process more than 1.4 million m3/day but no more than 5.6 million m3/day of natural gas; “Class B pipeline” means a pipeline with an outside diameter of 168.3 mm or more and less than 609.6 mm; “Class C LNG facility” means an LNG facility with a capacity to process more than 5.6 million m3/day of natural gas; “Class C natural gas facility” means a natural gas facility with a capacity to process more than 5.6 million m3/day of natural gas; “Class C pipeline” means a pipeline with an outside diameter of 609.6 mm or more; “hydrogen facility” has the same meaning as in section 1 of the Processing Facility Regulation; “LNG” means liquefied natural gas; “LNG facility” means a facility that processes natural gas and produces LNG; “major amendment” means an amendment to a permit to do one or more of the following: (a) increase by one hectare or more the approved area with respect to a wellsite, facility, pipeline, energy resource road or seismic line; (b) shift by 100 m or more the approved area with respect to anything referred to in paragraph (a); (c) change the approved activities under a permit to construct or operate a facility in a manner that would cause a change to (i) the class of facility as defined in section 1, or (ii) activities in relation to processing or to the handling of waste; (d) change the approved activities under a permit to construct or operate a facility by adding approval for additional storage; “marketable gas” means natural gas that is available for sale for direct consumption as a domestic, commercial or industrial fuel or as an industrial raw material, or is delivered to a storage facility, whether it occurs naturally or results from the processing of natural gas; “methanol facility” has the same meaning as in section 1 of the Processing Facility Regulation; “minor amendment” is an amendment to a permit that is not a major amendment; “natural gas conversion facility” has the same meaning as in section 1 of the Processing Facility Regulation; “natural gas facility” means a facility that is (a) a compressor station, (b) a gas dehydrator, or (c) a gas processing plant; “non-oil-and-gas facility” means a facility other than an LNG facility, natural gas facility, oil facility, ammonia facility, hydrogen facility, methanol facility or natural gas conversion facility; “oil facility” means a facility that processes petroleum.
Read the Fee, Levy and Security Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.