Bare Land Strata Regulations, B.C. Reg. 75/78
Section 6
No approval if access routes insufficient
Cite as Bare Land Strata Regulations, B.C. Reg. 75/78, s. 6 · last amended February 10, 2023 · read from BC Laws on November 17, 2026
The text
(1) The approving officer may decline to approve a bare land strata plan if, where the approving officer considers access routes are necessary, the approving officer considers that
(a) the width of the access routes are not sufficient to meet police and fire protection requirements,
(b) the access routes are not sufficient to provide practical and reasonable access to the strata lots, or
(c) the access routes have not been designed or are not capable of being constructed in accordance with standards generally accepted as good engineering practice.
(2) In considering the sufficiency of the access routes, the approving officer may consider
(a) reports from local fire protection and police authorities,
(b) engineering studies or reports of a professional engineer on the design and construction of the access routes,
(c) the proposed use of the land in the bare land strata plan and whether or not the access routes are suited to the use intended,
(d) the configuration of the land in the bare land strata plan, and
(e) the relation of the intended access routes to an existing highway or approach outside the bare land strata plan,
and the approving officer may, at the cost of the owner-developer, require an engineering study on the sufficiency of the access routes to be prepared by a professional engineer.
Read the Bare Land Strata Regulations on BC Laws ↗
Made under Strata Property Act, SBC 1998, c. 43.