Land-based Finfish Waste Control Regulation, B.C. Reg. 68/94
Section 3
Water quality report
Cite as Land-based Finfish Waste Control Regulation, B.C. Reg. 68/94, s. 3 · last amended October 1, 2018 · read from BC Laws on November 17, 2026
The text
(1) Subject to subsection (2) the owner of a land-based finfish facility must submit a receiving water quality report to a director before construction begins on
(a) a land-based finfish facility built after the date this regulation comes into force, or
(b) an expansion of a land-based finfish facility if the proposed resulting annual production is 20% greater than the annual production before the expansion.
(2) Unless requested by a director, a receiving water quality report is not required for facilities with a dilution ratio greater than 20 to 1.
(3) The receiving water quality report must include an analysis of the proposed discharge, the existing beneficial uses of the receiving water and predicted effects the proposed discharge will have on the receiving water, including, but not limited to
(a) hydraulic effects,
(b) the effects of both nitrogen and phosphorous compounds and the potential for eutrophication of the receiving waters, and
(c) the effect on receiving water temperature and dissolved oxygen concentrations.
Read the Land-based Finfish Waste Control Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.