Hazardous Waste Regulation, B.C. Reg. 63/88
Section 42.14
Requirements for contingency plans and operational plans
Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 42.14 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) A contingency plan or operational plan, as applicable, that is required for the operation of a facility or the transport of moderate risk waste authorized under this Part
(a) must be made available for inspection by an officer, or
(b) must, if required by a director,
(i) be submitted to the director,
(ii) be amended, or
(iii) be reviewed or amended by a qualified professional.
(2) If a contingency plan or operational plan must be amended under subsection (1) (b), the owner or operator, as the case may be, of the facility must submit the amended plan
(a) within 60 days of receiving notice from the director, or
(b) if approved by the director, within a specified period of time other than the period of time described in paragraph (a).
Read the Hazardous Waste Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.