Hazardous Waste Regulation, B.C. Reg. 63/88
Section 39.21
Contingency plans for e-waste
Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 39.21 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) The owner of a facility that manages e-waste must prepare and maintain a contingency plan for the management of e-waste that consists of or contains one or more of the following:
(a) lithium or lithium-ion batteries;
(b) waste lightbulbs containing mercury;
(c) switches containing mercury;
(d) glass containing lead.
(2) The contingency plan must include
(a) procedures to prevent breakage or other damage of the material described in subsection (1) (a) to (d) of this section during collection and transport, and
(b) procedures for handling the material described in subsection (1) (a) to (d) of this section in the event of breakage or other damage.
(3) The contingency plan
(a) must be made available for inspection by an officer,
(b) must be amended, if required by a director
(i) after the review by the director of the contingency plan, or
(ii) after an inspection conducted by the ministry, and
(c) must, if required by a director, be reviewed or amended by a qualified professional.
(4) If a contingency plan must be amended under subsection (3) (b) or (c) of this section, the owner of the facility must submit the amended plan
(a) within 60 days of receiving notice from the director, or
(b) if approved by the director, within a specified period of time other than the period of time described in paragraph (a) of this subsection.