Hazardous Waste Regulation, B.C. Reg. 63/88
Section 27
Performance standards
Cite as Hazardous Waste Regulation, B.C. Reg. 63/88, s. 27 · last amended July 1, 2026 · read from BC Laws on November 17, 2026
The text
(1) The owner of a secure landfill must not use or operate the secure landfill to dispose of any waste listed in Schedule 3.
(2) The owner of a secure landfill must design, construct, install and maintain a dual liner system
(a) to prevent any migration of wastes out of the landfill to the adjacent subsurface soil or groundwater during the operating life and after closure,
(b) with both liners constructed of impervious materials that prevent wastes from passing into or through the liner during the life of the facility, and
(i) if composed of soil or clay, each being not less than 0.5 m thick, and
(ii) if synthetic, each being at least 1 mm thick,
(c) with both liners constructed of materials having appropriate chemical properties, strength and thickness to prevent failure due to any of the following:
(i) pressure gradients;
(ii) contact with the waste or leachate to which the liners may be exposed;
(iii) climatic conditions;
(iv) stress of installation and operations, and
(d) with the liner system placed on base materials capable of providing support and resistance to pressure gradients above and below the liner system to prevent failure due to compression, uplift or settlement.
(3) The owner of a secure landfill must design, construct, install and maintain a leachate detection, collection and removal system that includes the following minimum characteristics:
(a) a leak detection system between the 2 liners to detect any leaks or migration of liquid into the space between the liners;
(b) a leachate collection system that is
(i) installed at a slope greater than 2%, in a porous material drainage layer with a minimum thickness of 0.75 m and permeability greater than 1x10-3 cm/s immediately above the upper liner,
(ii) constructed of materials that are
(A) chemically resistant to waste placed in the landfill and any leachate which might be generated, and
(B) of sufficient strength to prevent failure due to pressure of overlying loads in the secure landfill, and
(iii) designed and constructed to prevent clogging during the life of the facility;
(c) a storage facility suitable to allow removal of leachate.
(4) A secure landfill is in a non-compliance situation, with regard to groundwater quality, when analytical data from upgradient and downgradient groundwater monitoring wells for any parameters or chemical constituents are significantly different using approved statistical methods.
(5) The owner of a secure landfill must design, construct and maintain
(a) a system capable of preventing water from draining onto any cells of the secure landfill, and
(b) a system to collect and control water draining from any cells of the secure landfill
during a storm with a magnitude that is exceeded, on average, only once in 25 years.
(6) The owner of a secure landfill must ensure that any discharge of liquid effluent to the environment, to storm sewers or to a municipal or industrial effluent treatment works from the secure landfill meets the effluent criteria prescribed in Schedule 1.2.
(7) If particulate matter subject to wind dispersal is placed in the secure landfill, the owner must cover or otherwise manage the facility to prevent dispersal by wind.
(8) The owner of a secure landfill must, during closure of the landfill or any cell,
(a) make any modifications to works including drainage control, leachate collection, leak detection, monitoring and storage facilities to ensure long term operation with minimum maintenance and security,
(b) install and construct for the secure landfill a final cover with the following minimum characteristics:
(i) design and construction to function with minimum maintenance;
(ii) a foundation layer with a minimum thickness of 0.75 m constructed of soil, or other suitable granular material, compacted to maximum density at optimum moisture content according to acceptable engineering practice, to ensure the overall structural integrity of the final cover;
(iii) an intermediate layer of
(A) not less than 0.50 m of impervious soil or clay, or
(B) an impervious synthetic material not less than 1 mm thick;
(iv) a top layer of not less than 0.5 m of soil
(A) not containing waste, leachate or other material which would contaminate infiltrating water, and
(B) which would provide a suitable long term rooting medium;
(v) graded and maintained to prevent ponding and having slopes of 3% to 5%;
(vi) vegetation which
(A) is suitable to the area,
(B) is established by approved agronomic practices, and
(C) does not have a rooting depth greater than the depth of the top layer.
(9) An owner of a secure landfill must, before closure, prepare, to the satisfaction of a director, a post closure plan for
(a) maintaining the integrity and effectiveness of the final cover,
(b) maintaining and monitoring the leak detection system, reporting any migration of leachate through the liner,
(c) maintaining and operating the leachate collection and removal system and keeping records of any leachate removed,
(d) maintaining and operating the groundwater monitoring system,
(e) maintaining the drainage control system, and
(f) protecting and maintaining the survey benchmarks.
(10) On completion of closure the owner of the secure landfill site (including its buffer zone) must
(a) comply with the post closure plan approved under subsection (9), and
(b) transfer title of the property to the Crown.
Read the Hazardous Waste Regulation on BC Laws ↗
Made under Environmental Management Act, SBC 2003, c. 53.