Energy Resource Road Regulation, B.C. Reg. 56/2013

Section 24

Deactivation requirements

Cite as Energy Resource Road Regulation, B.C. Reg. 56/2013, s. 24 · last amended September 1, 2023 · read from BC Laws on November 17, 2026

The text

A road permit holder who deactivates an energy resource road must do all of the following: (a) barricade the road surface width in a clearly visible manner to prevent access by motor vehicles, other than all-terrain vehicles; (b) remove stream pipe culverts and arch culverts; (c) remove bridge and log or box culvert superstructures; (d) remove bridge and log or box culvert substructures, if the failure of those substructures would have a material adverse effect on downstream property, improvements or the environment; (d.1) remove engineered retaining walls, if the failure of those walls would have a material adverse effect on property, improvements or the environment; (e) stabilize the road prism and the clearing width of the road; (f) comply with section 19 (1) (c) and (d) of the Environmental Protection and Management Regulation, whether the road right of way is on Crown land or land other than Crown land.
Read the Energy Resource Road Regulation on BC Laws ↗

Made under Energy Resource Activities Act, SBC 2008, c. 36.