Depreciation of Industrial and Electrical Power Generating Facility Improvements Regulation, B.C. Reg. 53/2016
Section 7
Substations
Cite as Depreciation of Industrial and Electrical Power Generating Facility Improvements Regulation, B.C. Reg. 53/2016, s. 7 · last amended December 21, 2020 · read from BC Laws on November 17, 2026
The text
(1) In this section:
“age”, in relation to an improvement, means the chronological age of the improvement or, if the parts of the improvement have different chronological ages, the effective age of the improvement;
“applicable table”, in relation to an improvement, means the table in Schedule 5 whose title describes the improvement.
(2) Subject to sections 8 and 9, this section prescribes, for the purposes of section 20.1 of the Act, the depreciation rate for an improvement that is part of a substation.
(3) Subject to subsection (4), the depreciation rate is the rate set out in column 2 of the applicable table in Schedule 5 opposite the age of the improvement set out in column 1 of that table.
(4) If the assessor determines, as of October 31 in any year, that an electrical transformer that is part of a substation, other than a substation that is part of an electrical power generating facility described in section 8 (1), has a design capacity that is at least 100% greater than the peak megavolt amp load requirement of that transformer during the previous 12 months, the cost of that transformer must be reduced by 25% before application of the depreciation rate determined under subsection (3) for valuation of that transformer for the next assessment roll.
(5) Subsection (4) applies only if a transformer is installed to service a load requirement or anticipated load requirement, and, subsequent to the installation,
(a) the load requirement diminishes, or
(b) the anticipated load requirement does not occur.
Read the Depreciation of Industrial and Electrical Power Generating Facility Improvements Regulation on BC Laws ↗
Made under Assessment Act, RSBC 1996, c. 20.