Mineral Tenure Act Regulation, B.C. Reg. 529/2004

Section 15

Reports of physical exploration and development on a claim

Cite as Mineral Tenure Act Regulation, B.C. Reg. 529/2004, s. 15 · last amended March 11, 2021 · read from BC Laws on November 17, 2026

The text

(1) A report of physical exploration and development submitted as required by section 33 of the Act must include all of the following, as applicable: (a) a detailed written description explaining the type of activity and the result obtained; (b) the date the exploration and development started and the number of hours of work; (c) an itemized cost statement related to that activity including the costs for labour, food, accommodation, transportation, rental and operation of machinery, equipment and instruments; (d) a map at a scale of detail of 1:10 000 or more detailed that shows the geographic location of the exploration and development activity relative to the boundaries of the claim or block of claims on which the activity was carried out; (e) metric dimensions of all workings, openings and related activity referenced to the map described in paragraph (d) for trenches, open cuts, adits, pits, shafts and underground activity; (f) a map at a scale of detail of 1:5 000 or more detailed that shows the ground control or grid lines; (g) a plan prepared by the land surveyor from a precision survey; (h) a plan of the survey and differentially corrected coordinates of the legal posts surveyed from a global positioning survey; (i) the amount in metric units of material removed from the ground and tested or processed including the metric dimensions of the excavation for placer panning, digging and washing of gravel; (j) a statement of the qualifications of the author of the report. (2) Within 30 days after registering the statement of exploration and development the recorded holder of a claim must submit the report in a format acceptable to the chief gold commissioner. (3) If a recorded holder fails to submit a report as required under subsection (2), the chief gold commissioner may notify the recorded holder of the intention, under section 33 of the Act, to cancel the registration of the recording of exploration and development. (4) The report must document original exploration and development performed after the claims were registered or recorded. (5) If exploration and development activity is conducted on 2 or more claims and the work on each claim is the subject of a separate report, each report must attribute a fair apportionment of the cost to the relevant claim.
Read the Mineral Tenure Act Regulation on BC Laws ↗

Made under Mineral Tenure Act, RSBC 1996, c. 292.